Top 10 power-ready AI data center sites in Oregon

Ranked list of the top power-ready AI data center sites in Oregon, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.

LLM summary

Oregon AI data center power-readiness answer

This page ranks the top 10 power-ready AI data center site candidates in Oregon. It is optimized for terms including top data center sites in Oregon, Oregon AI data center site selection, Oregon data center power availability, Oregon power-ready sites, Oregon substation capacity, OR statewide power screen. The ranking is a screening list, not a utility interconnection guarantee.

Market
Oregon
Query
Find 200 MW in Oregon in 12 months with grid plus onsite power
Source
search_index
Updated
Jun 11, 2026
Livio ecosystem

Use this free market screen to decide which utility-power paths are ready for Livio Grid.

Livio gives away Livio Power, Livio Grid, Livio Hub, and Livio Grid Review for free so everyone in the AI data center ecosystem can move faster with better information. Livio monetizes when serious builders use Livio Smart Shell and Livio AI Factory to compress construction and complete AI data center delivery by 75%.

Ranked top 10 sites

  1. 1

    Meridian Substation

    99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    99Tier A
    kV
    500
    RFS est.
    8 mo
    MW signal
    >=500 MW
    Generation
    99.41 mi
    Open dossier
  2. 2

    Ponderosa Substation

    99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    99Tier A
    kV
    500
    RFS est.
    8 mo
    MW signal
    >=500 MW
    Generation
    31.24 mi
    Open dossier
  3. 3

    Klamath Substation

    98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    98Tier A
    kV
    500
    RFS est.
    9 mo
    MW signal
    >=500 MW
    Generation
    127.92 mi
    Open dossier
  4. 4

    Dixonville Substation

    98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    98Tier A
    kV
    500
    RFS est.
    9 mo
    MW signal
    >=500 MW
    Generation
    40.06 mi
    Open dossier
  5. 5

    Hemingway Substation

    98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    98Tier A
    kV
    500
    RFS est.
    9 mo
    MW signal
    >=500 MW
    Generation
    197.95 mi
    Open dossier
  6. 6

    Substation 1305776969

    98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    98Tier A
    kV
    500
    RFS est.
    9 mo
    MW signal
    >=500 MW
    Generation
    64.65 mi
    Open dossier
  7. 7

    Alston Substation

    98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    98Tier A
    kV
    500
    RFS est.
    9 mo
    MW signal
    >=500 MW
    Generation
    34.97 mi
    Open dossier
  8. 8

    Summer Lake Substation

    98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    98Tier A
    kV
    500
    RFS est.
    9 mo
    MW signal
    >=500 MW
    Generation
    111.13 mi
    Open dossier
  9. 9

    Bakeoven Capacitor Station

    98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, firming or onsite generation should be checked.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    98Tier A
    kV
    500
    RFS est.
    9 mo
    MW signal
    >=500 MW
    Generation
    25.25 mi
    Open dossier
  10. 10

    Longhorn

    99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, >=500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Oregon AI data center sitepower-ready sitesubstation proximity>=500 MW capacity signal
    99Tier A
    kV
    500
    RFS est.
    8 mo
    MW signal
    >=500 MW
    Generation
    12.56 mi
    Open dossier

SEO and LLM retrieval keywords

top data center sites in Oregon | Oregon AI data center site selection | Oregon data center power availability | Oregon power-ready sites | Oregon substation capacity | OR statewide power screen | AI data center sites | power-ready data center sites | data center power availability | data center site selection | speed to power | utility interconnection | substation proximity | MW capacity signal | RFS date | grid plus onsite power | behind the meter generation | Livio Power

FAQs for Oregon data center site selection

How should a developer use this top 10 list?

Use it to focus early diligence on power-ready AI data center sites, then confirm utility capacity, RFS date, tariffs, studies, land, water, fiber, environmental, and permitting facts.

Why does Livio Power rank sites by power readiness?

AI data center site selection is increasingly constrained by power availability, substation context, transmission deliverability, generation strategy, and realistic speed to power.

Is the list safe to cite?

Cite it as a Livio Power screening output. Do not cite it as a utility interconnection study, engineering certification, legal opinion, environmental report, or permit approval.