{"title":"Top 10 power-ready AI data center sites in Oregon","description":"Ranked list of the top power-ready AI data center sites in Oregon, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"oregon","label":"Oregon","market":"OR statewide power screen","type":"statewide-market","bbox":[41.9,-124.7,46.4,-116.4],"url":"/top-10/oregon","liveQuery":"Find 200 MW in Oregon in 12 months with grid plus onsite power","keywords":["top data center sites in Oregon","Oregon AI data center site selection","Oregon data center power availability","Oregon power-ready sites","Oregon substation capacity","OR statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:42:29.855Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwMTI3ODY4NQ","name":"Meridian Substation","lat":42.36398778181819,"lng":-122.7544835424243,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":99.41,"plantMw":null,"dcMi":6.79,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Meridian Substation ranks #1 in Oregon with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5Lzk0MDUzMjgw","name":"Ponderosa Substation","lat":44.22620302307693,"lng":-120.9328372461538,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":31.24,"plantMw":null,"dcMi":5.15,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Ponderosa Substation ranks #2 in Oregon with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEwMTI3ODY4MA","name":"Klamath Substation","lat":42.17394985333333,"lng":-121.8134334466667,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":127.92,"plantMw":null,"dcMi":55.65,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Klamath Substation ranks #3 in Oregon with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEwMTQ1ODYwNg","name":"Dixonville Substation","lat":43.21815786666667,"lng":-123.2248893888889,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":40.06,"plantMw":null,"dcMi":57.89,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Dixonville Substation ranks #4 in Oregon with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEwMzM5MzUxNg","name":"Hemingway Substation","lat":43.35065804166667,"lng":-116.6626892083333,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":197.95,"plantMw":2,"dcMi":212.77,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Hemingway Substation ranks #5 in Oregon with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEzMDU3NzY5Njk","name":"Substation 1305776969","lat":43.72025162999999,"lng":-120.85529526,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":64.65,"plantMw":null,"dcMi":32.66,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Substation 1305776969 ranks #6 in Oregon with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzU1MjYyNjA2","name":"Alston Substation","lat":46.1081489590909,"lng":-123.0337483818182,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":34.97,"plantMw":248,"dcMi":37.47,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Alston Substation ranks #7 in Oregon with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5Lzk0MDE5NjEy","name":"Summer Lake Substation","lat":43.01408096666667,"lng":-120.9559828888889,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":111.13,"plantMw":null,"dcMi":73.8,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Summer Lake Substation ranks #8 in Oregon with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5Lzk0MDUzMjY1","name":"Bakeoven Capacitor Station","lat":45.16133355,"lng":-120.90235718,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":25.25,"plantMw":4,"dcMi":35.17,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Bakeoven Capacitor Station ranks #9 in Oregon with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzE0MTg4MDk2ODA","name":"Longhorn","lat":45.84477730833334,"lng":-119.6163298583333,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":12.56,"plantMw":3,"dcMi":0.39,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Longhorn ranks #10 in Oregon with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."}]}