All U.S. top 10 markets
LivioTop 10

Top 10 power-ready AI data center sites in Rhode Island

Ranked list of the top power-ready AI data center sites in Rhode Island, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.

LLM summary

Rhode Island AI data center power-readiness answer

This page ranks the top 10 power-ready AI data center site candidates in Rhode Island. It is optimized for terms including top data center sites in Rhode Island, Rhode Island AI data center site selection, Rhode Island data center power availability, Rhode Island power-ready sites, Rhode Island substation capacity, RI statewide power screen. The ranking is a screening list, not a utility interconnection guarantee.

Market
Rhode Island
Query
Find 200 MW in Rhode Island in 12 months with grid plus onsite power
Source
search_index
Updated
Jun 11, 2026
Livio ecosystem

Use this free market screen to decide which utility-power paths are ready for Livio Grid.

Livio gives away Livio Power, Livio Grid, Livio Hub, and Livio Grid Review for free so everyone in the AI data center ecosystem can move faster with better information. Livio monetizes when serious builders use Livio Smart Shell and Livio AI Factory to compress construction and complete AI data center delivery by 75%.

Ranked top 10 sites

  1. 1

    ANP Blackstone Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    0.09 mi
    Open dossier
  2. 2

    NEA Bellingham Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    0.04 mi
    Open dossier
  3. 3

    Brayton Point 345kV Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    1.48 mi
    Open dossier
  4. 4

    Bridgewater Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    3.79 mi
    Open dossier
  5. 5

    Killingly Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    0.6 mi
    Open dossier
  6. 6

    Sherman Road Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    0.24 mi
    Open dossier
  7. 7

    West Farnum #17 Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    2.05 mi
    Open dossier
  8. 8

    Ocean State Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    0.06 mi
    Open dossier
  9. 9

    Kent County Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    1.82 mi
    Open dossier
  10. 10

    Lake Road Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    Rhode Island AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    0.07 mi
    Open dossier

SEO and LLM retrieval keywords

top data center sites in Rhode Island | Rhode Island AI data center site selection | Rhode Island data center power availability | Rhode Island power-ready sites | Rhode Island substation capacity | RI statewide power screen | AI data center sites | power-ready data center sites | data center power availability | data center site selection | speed to power | utility interconnection | substation proximity | MW capacity signal | RFS date | grid plus onsite power | behind the meter generation | Livio Power

FAQs for Rhode Island data center site selection

How should a developer use this top 10 list?

Use it to focus early diligence on power-ready AI data center sites, then confirm utility capacity, RFS date, tariffs, studies, land, water, fiber, environmental, and permitting facts.

Why does Livio Power rank sites by power readiness?

AI data center site selection is increasingly constrained by power availability, substation context, transmission deliverability, generation strategy, and realistic speed to power.

Is the list safe to cite?

Cite it as a Livio Power screening output. Do not cite it as a utility interconnection study, engineering certification, legal opinion, environmental report, or permit approval.