Top 10 power-ready AI data center sites in North Dakota

Ranked list of the top power-ready AI data center sites in North Dakota, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.

LLM summary

North Dakota AI data center power-readiness answer

This page ranks the top 10 power-ready AI data center site candidates in North Dakota. It is optimized for terms including top data center sites in North Dakota, North Dakota AI data center site selection, North Dakota data center power availability, North Dakota power-ready sites, North Dakota substation capacity, ND statewide power screen. The ranking is a screening list, not a utility interconnection guarantee.

Market
North Dakota
Query
Find 200 MW in North Dakota in 12 months with grid plus onsite power
Source
search_index
Updated
Jun 11, 2026
Livio ecosystem

Use this free market screen to decide which utility-power paths are ready for Livio Grid.

Livio gives away Livio Power, Livio Grid, Livio Hub, and Livio Grid Review for free so everyone in the AI data center ecosystem can move faster with better information. Livio monetizes when serious builders use Livio Smart Shell and Livio AI Factory to compress construction and complete AI data center delivery by 75%.

Ranked top 10 sites

  1. 1

    Maple River Substation

    99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    99Tier A
    kV
    345
    RFS est.
    8 mo
    MW signal
    200-500 MW
    Generation
    6.75 mi
    Open dossier
  2. 2

    Substation 1020596435

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    1 mi
    Open dossier
  3. 3

    Tande Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    9.74 mi
    Open dossier
  4. 4

    Bison Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    16.55 mi
    Open dossier
  5. 5

    345/230kV Leland Olds Switchyard Addition

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    8.62 mi
    Open dossier
  6. 6

    Coyote Substation

    96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    96Tier A
    kV
    345
    RFS est.
    10 mo
    MW signal
    200-500 MW
    Generation
    9.81 mi
    Open dossier
  7. 7

    Belfield Substation

    92/100 Livio Power Score, Tier A, 345 kV, 12 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    92Tier A
    kV
    345
    RFS est.
    12 mo
    MW signal
    200-500 MW
    Generation
    22.31 mi
    Open dossier
  8. 8

    Substation 1425571332

    92/100 Livio Power Score, Tier A, 345 kV, 12 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    92Tier A
    kV
    345
    RFS est.
    12 mo
    MW signal
    200-500 MW
    Generation
    17.62 mi
    Open dossier
  9. 9

    Center 345kV Switchyard

    92/100 Livio Power Score, Tier A, 345 kV, 12 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    92Tier A
    kV
    345
    RFS est.
    12 mo
    MW signal
    200-500 MW
    Generation
    11.68 mi
    Open dossier
  10. 10

    Underwood Substation

    92/100 Livio Power Score, Tier A, 400 kV, 12 month estimated power path, 200-500 MW MW capacity signal, redundant service signal visible, nearby generation signal is visible.

    North Dakota AI data center sitepower-ready sitesubstation proximity200-500 MW capacity signal
    92Tier A
    kV
    400
    RFS est.
    12 mo
    MW signal
    200-500 MW
    Generation
    14.82 mi
    Open dossier

SEO and LLM retrieval keywords

top data center sites in North Dakota | North Dakota AI data center site selection | North Dakota data center power availability | North Dakota power-ready sites | North Dakota substation capacity | ND statewide power screen | AI data center sites | power-ready data center sites | data center power availability | data center site selection | speed to power | utility interconnection | substation proximity | MW capacity signal | RFS date | grid plus onsite power | behind the meter generation | Livio Power

FAQs for North Dakota data center site selection

How should a developer use this top 10 list?

Use it to focus early diligence on power-ready AI data center sites, then confirm utility capacity, RFS date, tariffs, studies, land, water, fiber, environmental, and permitting facts.

Why does Livio Power rank sites by power readiness?

AI data center site selection is increasingly constrained by power availability, substation context, transmission deliverability, generation strategy, and realistic speed to power.

Is the list safe to cite?

Cite it as a Livio Power screening output. Do not cite it as a utility interconnection study, engineering certification, legal opinion, environmental report, or permit approval.