{"title":"Top 10 power-ready AI data center sites in Washington","description":"Ranked list of the top power-ready AI data center sites in Washington, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"washington","label":"Washington","market":"WA statewide power screen","type":"statewide-market","bbox":[45.4,-124.9,49.1,-116.9],"url":"/top-10/washington","liveQuery":"Find 200 MW in Washington in 12 months with grid plus onsite power","keywords":["top data center sites in Washington","Washington AI data center site selection","Washington data center power availability","Washington power-ready sites","Washington substation capacity","WA statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:46:39.951Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzI1NDk1NTIz","name":"Clayburn Substation","lat":49.06933909117647,"lng":-122.2969996411765,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":59.23,"plantMw":200,"dcMi":23.11,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Clayburn Substation ranks #1 in Washington with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzQwNTE0Mjgy","name":"Schultz Substation","lat":47.1206160875,"lng":-120.5109197375,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":35.26,"plantMw":null,"dcMi":23.2,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Schultz Substation ranks #2 in Washington with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzQwNTI0MTQy","name":"Bell Substation","lat":47.75002459615385,"lng":-117.3736744769231,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":47.82,"plantMw":null,"dcMi":6.96,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Bell Substation ranks #3 in Washington with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzQxNDI5MTYw","name":"Columbia Substation","lat":47.29561661764705,"lng":-120.0768338,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":51.8,"plantMw":null,"dcMi":5.77,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Columbia Substation ranks #4 in Washington with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzQxNDQ2NTM2","name":"Vantage Substation","lat":46.87720761923077,"lng":-119.9396666538462,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":33.18,"plantMw":null,"dcMi":24.96,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Vantage Substation ranks #5 in Washington with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzE3MTU0ODgxMg","name":"Substation 171548812","lat":46.75406633999999,"lng":-122.86467157,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":32.64,"plantMw":199,"dcMi":39.29,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Substation 171548812 ranks #6 in Washington with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzQwNjI5MTIx","name":"Hanford Substation","lat":46.6699935,"lng":-119.5712817541667,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":45.3,"plantMw":null,"dcMi":41.32,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Hanford Substation ranks #7 in Washington with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzUwMTAyODk4","name":"Paul Substation","lat":46.75492156874999,"lng":-122.8755003125,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":32.15,"plantMw":199,"dcMi":39.6,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Paul Substation ranks #8 in Washington with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzUwMjg2Njcx","name":"Napavine Substation","lat":46.62255432222221,"lng":-122.9176371611111,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":35.78,"plantMw":199,"dcMi":47.76,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Napavine Substation ranks #9 in Washington with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzU1MjYyNjA2","name":"Alston Substation","lat":46.1081489590909,"lng":-123.0337483818182,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":34.97,"plantMw":248,"dcMi":37.47,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Alston Substation ranks #10 in Washington with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."}]}