{"title":"Top 10 power-ready AI data center sites in Utah","description":"Ranked list of the top power-ready AI data center sites in Utah, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"utah","label":"Utah","market":"UT statewide power screen","type":"statewide-market","bbox":[36.9,-114.1,42.1,-109],"url":"/top-10/utah","liveQuery":"Find 200 MW in Utah in 12 months with grid plus onsite power","keywords":["top data center sites in Utah","Utah AI data center site selection","Utah data center power availability","Utah power-ready sites","Utah substation capacity","UT statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:43:05.574Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwMjQwNTE5OTg","name":"Substation 1024051998","lat":40.26070913684211,"lng":-112.0185459368421,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":9.38,"plantMw":null,"dcMi":0.38,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1024051998 ranks #1 in Utah with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwNDcxNzM3OQ","name":"Navajo Generating Station Unit","lat":36.90253836153846,"lng":-111.3939428692308,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":5.48,"plantMw":1312,"dcMi":119.22,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Navajo Generating Station Unit ranks #2 in Utah with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzE0NzM0MzY5NzM","name":"Substation 1473436973","lat":40.07840552,"lng":-112.0985642,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":1.45,"plantMw":525,"dcMi":13.64,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1473436973 ranks #3 in Utah with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzE0NzM0MzY5Nzc","name":"Substation 1473436977","lat":40.08010872,"lng":-112.09709856,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":1.31,"plantMw":525,"dcMi":13.5,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1473436977 ranks #4 in Utah with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzE0NzM0NDA2ODc","name":"Substation 1473440687","lat":40.26730338,"lng":-112.02232324,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":9.2,"plantMw":null,"dcMi":0.17,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1473440687 ranks #5 in Utah with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzMzNTQ0ODc5","name":"90th South Substation","lat":40.58957404285714,"lng":-111.9159140285714,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":1.18,"plantMw":null,"dcMi":4.25,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"90th South Substation ranks #6 in Utah with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzMzNTQ1MDk4","name":"Mid-Valley Substation","lat":40.70727473333334,"lng":-111.9288779666667,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":2.71,"plantMw":null,"dcMi":2.75,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Mid-Valley Substation ranks #7 in Utah with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzMzNjU1NjQy","name":"Camp Williams Substation","lat":40.46789635,"lng":-111.947558095,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":3.11,"plantMw":null,"dcMi":8.44,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Camp Williams Substation ranks #8 in Utah with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzcwMjI3Njc3OQ","name":"Clover Substation","lat":39.78829022000001,"lng":-111.89403321,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":2.29,"plantMw":172,"dcMi":33.59,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Clover Substation ranks #9 in Utah with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzczMzE1MDY3MQ","name":"Substation 733150671","lat":40.33132271666667,"lng":-111.76101835,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":0.27,"plantMw":1385,"dcMi":1.75,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 733150671 ranks #10 in Utah with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."}]}