{"title":"Top 10 power-ready AI data center sites in Texas Triangle","description":"Ranked list of the top power-ready AI data center sites in Texas Triangle, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"texas-triangle","label":"Texas Triangle","market":"ERCOT large-load growth","type":"featured-corridor","bbox":[29.1,-98.9,33.2,-95],"url":"/top-10/texas-triangle","liveQuery":"Find 200 MW in Texas Triangle in 12 months with grid plus onsite power","keywords":["top data center sites in Texas Triangle","Texas Triangle AI data center site selection","Texas Triangle data center power availability","Texas Triangle power-ready sites","Texas Triangle substation capacity","ERCOT large-load growth","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:42:52.217Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwMjMyNjkzOQ","name":"King Substation","lat":29.91526366,"lng":-95.21614893999998,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":6.65,"plantMw":50,"dcMi":21.53,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"King Substation ranks #1 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwNTM4OTEzNzU","name":"Substation 1053891375","lat":32.6392623090909,"lng":-97.25555938181819,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":4.59,"plantMw":null,"dcMi":3.82,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1053891375 ranks #2 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEyNzI0NTcyMg","name":"Austrop Substation","lat":30.25108614285714,"lng":-97.48717755714286,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":8.74,"plantMw":null,"dcMi":8.25,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Austrop Substation ranks #3 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEzNTA0Mzc4MTE","name":"Substation 1350437811","lat":29.71239511666667,"lng":-95.13556195,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":0.06,"plantMw":180,"dcMi":18.85,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1350437811 ranks #4 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzExMDU2NDE3Mg","name":"Skyline Substation","lat":29.57980957333334,"lng":-98.40852773333334,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":4.05,"plantMw":null,"dcMi":7.97,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Skyline Substation ranks #5 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEyMTcyMjI2NDk","name":"Hornsby Substation","lat":30.23174913846153,"lng":-97.61370310769229,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":3.55,"plantMw":null,"dcMi":1.16,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Hornsby Substation ranks #6 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEyMTcyMjI2NTg","name":"Tesla Battery Substation","lat":30.23147272,"lng":-97.61587420000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":3.54,"plantMw":null,"dcMi":1.11,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Tesla Battery Substation ranks #7 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzEzMzcyOTI2NDk","name":"Substation 1337292649","lat":32.23325493999999,"lng":-96.70062128,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":9.79,"plantMw":null,"dcMi":21.8,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1337292649 ranks #8 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzEzMzcyOTI2NTA","name":"Substation 1337292650","lat":32.23273651428572,"lng":-96.70018359999999,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":9.81,"plantMw":null,"dcMi":21.84,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1337292650 ranks #9 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzE0NjIwNzU3MzY","name":"Johnson Switching Station","lat":32.39461311,"lng":-97.48554956999999,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":4.67,"plantMw":null,"dcMi":14.79,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Johnson Switching Station ranks #10 in Texas Triangle with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."}]}