{"title":"Top 10 power-ready AI data center sites in Tennessee","description":"Ranked list of the top power-ready AI data center sites in Tennessee, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"tennessee","label":"Tennessee","market":"TN statewide power screen","type":"statewide-market","bbox":[34.9,-90.4,36.7,-81.6],"url":"/top-10/tennessee","liveQuery":"Find 200 MW in Tennessee in 12 months with grid plus onsite power","keywords":["top data center sites in Tennessee","Tennessee AI data center site selection","Tennessee data center power availability","Tennessee power-ready sites","Tennessee substation capacity","TN statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:44:32.406Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwNjc1OTM1Nw","name":"Gleason Substation","lat":36.24492268749999,"lng":-88.61170722499999,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.09,"plantMw":568,"dcMi":17.21,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Gleason Substation ranks #1 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwNjc4MjUzMw","name":"Johnsonville 500kV Substation","lat":36.0236969,"lng":-87.98187884285714,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.67,"plantMw":63,"dcMi":28.2,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Johnsonville 500kV Substation ranks #2 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEwNjgwNjE4MQ","name":"Jackson Switching Station","lat":35.7016901375,"lng":-88.78966900625,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":9.51,"plantMw":1,"dcMi":50.56,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Jackson Switching Station ranks #3 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEwNjk5MTYwNw","name":"Wilson Substation","lat":36.20557843333333,"lng":-86.4646663111111,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":6.99,"plantMw":0,"dcMi":14.76,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Wilson Substation ranks #4 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEwNjk5NDg3MQ","name":"Maury Substation","lat":35.673224295,"lng":-87.01841873,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":19.98,"plantMw":1,"dcMi":19.6,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Maury Substation ranks #5 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEwODY0MjY5NA","name":"Phipps Bend Substation","lat":36.46079733076922,"lng":-82.80727578461538,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":10.35,"plantMw":423,"dcMi":32.97,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Phipps Bend Substation ranks #6 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEwODc4NjYwOTI","name":"Bad Creek Hydro Substation","lat":35.00724728333334,"lng":-82.99714875000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.02,"plantMw":1392,"dcMi":69.51,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Bad Creek Hydro Substation ranks #7 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzExNzI3Njc5Mjg","name":"Cordova Substation","lat":35.17447698888889,"lng":-89.74530190555556,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":4.8,"plantMw":null,"dcMi":20.39,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Cordova Substation ranks #8 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzEyMTg5NTMyMjA","name":"Volunteer Substation","lat":36.12202102666666,"lng":-83.81477628,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":2.92,"plantMw":null,"dcMi":28.26,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Volunteer Substation ranks #9 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzEyNzQ2MzU0NTI","name":"Aurora Substation","lat":35.41678248333333,"lng":-89.40352585000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.93,"plantMw":4,"dcMi":45.88,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Aurora Substation ranks #10 in Tennessee with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."}]}