{"title":"Top 10 power-ready AI data center sites in Phoenix","description":"Ranked list of the top power-ready AI data center sites in Phoenix, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"phoenix","label":"Phoenix","market":"Arizona power and water screen","type":"featured-corridor","bbox":[32.85,-113,34.1,-111.3],"url":"/top-10/phoenix","liveQuery":"Find 200 MW in Phoenix in 12 months with grid plus onsite power","keywords":["top data center sites in Phoenix","Phoenix AI data center site selection","Phoenix data center power availability","Phoenix power-ready sites","Phoenix substation capacity","Arizona power and water screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:42:06.045Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwNTAzMTE5NA","name":"Liberty Substation","lat":33.41244712222223,"lng":-112.5013722,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":3.8,"plantMw":null,"dcMi":7.42,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Liberty Substation ranks #1 in Phoenix with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwNTAzMTI1Mw","name":"Rudd Substation","lat":33.40959944,"lng":-112.31753935,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.25,"plantMw":250,"dcMi":2.56,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Rudd Substation ranks #2 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEwNTE5OTE0MQ","name":"Westwing Substation","lat":33.70726960363636,"lng":-112.3211515454546,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.56,"plantMw":null,"dcMi":12.39,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Westwing Substation ranks #3 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEwNTE5OTE1Nw","name":"Perkins Substation","lat":33.70520574545455,"lng":-112.3266276181818,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.75,"plantMw":null,"dcMi":12.67,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Perkins Substation ranks #4 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEwNTc4MDI3Nw","name":"Morgan Substation (TS-9)","lat":33.81672002857143,"lng":-112.2620587928571,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":1.17,"plantMw":7,"dcMi":13.11,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Morgan Substation (TS-9) ranks #5 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEwNjQ3OTA4Mg","name":"Jojoba Switchyard","lat":33.23080408000001,"lng":-112.62181893,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":2.95,"plantMw":260,"dcMi":19.22,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Jojoba Switchyard ranks #6 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEzMDEwMjE5NTQ","name":"Substation 1301021954","lat":33.24092984,"lng":-112.5696059,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.17,"plantMw":260,"dcMi":16.51,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1301021954 ranks #7 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzE1MzU5NjkxMg","name":"Pinal West Substation","lat":32.99809172727272,"lng":-112.1961250636364,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":8.28,"plantMw":null,"dcMi":25.9,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Pinal West Substation ranks #8 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzI4ODA4Njk0","name":"Greenbone Substation","lat":33.35546131666667,"lng":-111.5994802388889,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":2.42,"plantMw":null,"dcMi":0.65,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Greenbone Substation ranks #9 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzkxMTU0MzQz","name":"Palo Verde Generating Switchyard","lat":33.38460406923077,"lng":-112.8610462307692,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.23,"plantMw":3937,"dcMi":28.18,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Palo Verde Generating Switchyard ranks #10 in Phoenix with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."}]}