{"title":"Top 10 power-ready AI data center sites in Pennsylvania","description":"Ranked list of the top power-ready AI data center sites in Pennsylvania, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"pennsylvania","label":"Pennsylvania","market":"PA statewide power screen","type":"statewide-market","bbox":[39.7,-80.6,42.6,-74.6],"url":"/top-10/pennsylvania","liveQuery":"Find 200 MW in Pennsylvania in 12 months with grid plus onsite power","keywords":["top data center sites in Pennsylvania","Pennsylvania AI data center site selection","Pennsylvania data center power availability","Pennsylvania power-ready sites","Pennsylvania substation capacity","PA statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:46:59.765Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEyNTEwNzk0Mg","name":"Juniata Substation","lat":40.42925782380952,"lng":-77.17093225714285,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":33.97,"plantMw":306,"dcMi":69.9,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Juniata Substation ranks #1 in Pennsylvania with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5Lzc4NTUxOTk2","name":"Cabot Substation","lat":40.80211725555555,"lng":-79.79640534444445,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":25.82,"plantMw":850,"dcMi":28.93,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Cabot Substation ranks #2 in Pennsylvania with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEwMjE1NjY3Mw","name":"South Bend Generation Station","lat":40.638600975,"lng":-79.350389975,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.07,"plantMw":172,"dcMi":36.5,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"South Bend Generation Station ranks #3 in Pennsylvania with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEwMjE1NjY3NA","name":"South Bend Switching Station","lat":40.64168383333333,"lng":-79.34625876666668,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.36,"plantMw":172,"dcMi":36.21,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"South Bend Switching Station ranks #4 in Pennsylvania with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEwNzQyMTAyMw","name":"Three Mile Island 500kV Substation","lat":40.15068612666667,"lng":-76.71369136000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":3.82,"plantMw":306,"dcMi":62.05,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Three Mile Island 500kV Substation ranks #5 in Pennsylvania with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzExNzM4NDgxNw","name":"Susquehanna Substation","lat":41.08781175000001,"lng":-76.14937319285714,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.32,"plantMw":1300,"dcMi":0.32,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Susquehanna Substation ranks #6 in Pennsylvania with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEyMTg2MzY2NTQ","name":"Lauschtown 500 kV switchgear","lat":40.21740611666667,"lng":-76.01505278333333,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":8.48,"plantMw":3,"dcMi":28.74,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Lauschtown 500 kV switchgear ranks #7 in Pennsylvania with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzEyMjExMTU3MTE","name":"Arsenal to Logans Ferry","lat":40.47301474,"lng":-79.90486328,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":6.23,"plantMw":null,"dcMi":7.89,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Arsenal to Logans Ferry ranks #8 in Pennsylvania with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzEyMjExMTU3NDA","name":"Green Energy Resources Substation","lat":39.89195342,"lng":-79.93148886,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":12.52,"plantMw":13,"dcMi":37.45,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Green Energy Resources Substation ranks #9 in Pennsylvania with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzEyMzc4ODQ2Nzg","name":"Substation 1237884678","lat":41.09158355555556,"lng":-76.14707582222222,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.06,"plantMw":1300,"dcMi":0.54,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1237884678 ranks #10 in Pennsylvania with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."}]}