{"title":"Top 10 power-ready AI data center sites in Ohio","description":"Ranked list of the top power-ready AI data center sites in Ohio, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"ohio","label":"Ohio","market":"OH statewide power screen","type":"statewide-market","bbox":[38.3,-84.9,42.4,-80.5],"url":"/top-10/ohio","liveQuery":"Find 200 MW in Ohio in 12 months with grid plus onsite power","keywords":["top data center sites in Ohio","Ohio AI data center site selection","Ohio data center power availability","Ohio power-ready sites","Ohio substation capacity","OH statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:42:51.427Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwNDg0MjI4NjA","name":"Substation 1048422860","lat":38.57278676521739,"lng":-82.7824394173913,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":765,"plantMi":44.2,"plantMw":null,"dcMi":60.69,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Substation 1048422860 ranks #1 in Ohio with a 99/100 Livio Power Score, Tier A, 765 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEyMDQwMjU4MA","name":"Hanging Rock Substation","lat":38.56944829374999,"lng":-82.77496875,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":765,"plantMi":44.2,"plantMw":null,"dcMi":60.25,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Hanging Rock Substation ranks #2 in Ohio with a 99/100 Livio Power Score, Tier A, 765 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzE1MTAwODkxNw","name":"North Proctorville Substation","lat":38.47763406153847,"lng":-82.3952622846154,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":765,"plantMi":30.9,"plantMw":1300,"dcMi":38.81,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"North Proctorville Substation ranks #3 in Ohio with a 99/100 Livio Power Score, Tier A, 765 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzM2OTE1MTgw","name":"Don Marquis Substation","lat":39.02202744285715,"lng":-83.0099332114286,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":765,"plantMi":34.74,"plantMw":null,"dcMi":51.41,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Don Marquis Substation ranks #4 in Ohio with a 99/100 Livio Power Score, Tier A, 765 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzExOTk5ODM3NzE","name":"Substation 1199983771","lat":39.34068286666668,"lng":-80.61911034,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":35.35,"plantMw":816,"dcMi":89.52,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Substation 1199983771 ranks #5 in Ohio with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEwMjM0NDIzOTU","name":"Substation 1023442395","lat":39.4505326625,"lng":-84.45975755,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":0.11,"plantMw":82,"dcMi":7.26,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1023442395 ranks #6 in Ohio with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEwODMyNTcyNzU","name":"Lordstown Energy Center Substation","lat":41.14910342,"lng":-80.85335176500001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":5.56,"plantMw":27,"dcMi":13.7,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Lordstown Energy Center Substation ranks #7 in Ohio with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzExOTYyNDQ1NzU","name":"Substation 1196244575","lat":39.92979949090909,"lng":-81.5364372181818,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":765,"plantMi":0.53,"plantMw":625,"dcMi":62.74,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 1196244575 ranks #8 in Ohio with a 99/100 Livio Power Score, Tier A, 765 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzExOTYyNDQ1ODI","name":"Substation 1196244582","lat":39.93659641249999,"lng":-81.5371295,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":765,"plantMi":0.08,"plantMw":625,"dcMi":62.81,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 1196244582 ranks #9 in Ohio with a 99/100 Livio Power Score, Tier A, 765 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzEyMDk4NTQ5MQ","name":"Brownstown Substation","lat":42.1164455352941,"lng":-83.24877474117648,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":6.84,"plantMw":null,"dcMi":7.21,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Brownstown Substation ranks #10 in Ohio with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."}]}