{"title":"Top 10 power-ready AI data center sites in New York","description":"Ranked list of the top power-ready AI data center sites in New York, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"new-york","label":"New York","market":"NY statewide power screen","type":"statewide-market","bbox":[40.4,-79.8,45.1,-71.8],"url":"/top-10/new-york","liveQuery":"Find 200 MW in New York in 12 months with grid plus onsite power","keywords":["top data center sites in New York","New York AI data center site selection","New York data center power availability","New York power-ready sites","New York substation capacity","NY statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:54:27.693Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzExNzM4NDgxNw","name":"Susquehanna Substation","lat":41.08781175000001,"lng":-76.14937319285714,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":74.32,"plantMw":4,"dcMi":0.32,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Susquehanna Substation ranks #1 in New York with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEyMzc4ODQ2Nzg","name":"Substation 1237884678","lat":41.09158355555556,"lng":-76.14707582222222,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":74.03,"plantMw":4,"dcMi":0.54,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Substation 1237884678 ranks #2 in New York with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEzNjE3NTMwNDY","name":"Substation 1361753046","lat":41.08817106666667,"lng":-76.14749028333334,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":74.26,"plantMw":4,"dcMi":0.35,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Substation 1361753046 ranks #3 in New York with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzE0MjQzMTYzMw","name":"Massena Substation","lat":44.92126704,"lng":-74.83527582999999,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":765,"plantMi":72.05,"plantMw":null,"dcMi":18.89,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Massena Substation ranks #4 in New York with a 99/100 Livio Power Score, Tier A, 765 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEwMjE1NjY3Mw","name":"South Bend Generation Station","lat":40.638600975,"lng":-79.350389975,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":54.36,"plantMw":6,"dcMi":36.5,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"South Bend Generation Station ranks #5 in New York with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEwMjE1NjY3NA","name":"South Bend Switching Station","lat":40.64168383333333,"lng":-79.34625876666668,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":54.12,"plantMw":6,"dcMi":36.21,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"South Bend Switching Station ranks #6 in New York with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEyMzg3NjQ5MzQ","name":"500 kV switchgear","lat":40.83522327857143,"lng":-76.8290185,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":74.32,"plantMw":6,"dcMi":39.28,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"500 kV switchgear ranks #7 in New York with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzEyNTEwNzk0Mg","name":"Juniata Substation","lat":40.42925782380952,"lng":-77.17093225714285,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":60.39,"plantMw":6,"dcMi":69.9,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Juniata Substation ranks #8 in New York with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzE0Njc4NjgxNg","name":"Lackawanna Substation","lat":41.49808854333332,"lng":-75.60978800333334,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":39.56,"plantMw":4,"dcMi":39.8,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Lackawanna Substation ranks #9 in New York with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzExNjk3ODYyNDI","name":"Newark Airport Metering and Regulating Station","lat":40.70400474285714,"lng":-74.1499887142857,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":5.39,"plantMw":null,"dcMi":2.58,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Newark Airport Metering and Regulating Station ranks #10 in New York with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."}]}