{"title":"Top 10 power-ready AI data center sites in Nevada","description":"Ranked list of the top power-ready AI data center sites in Nevada, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"nevada","label":"Nevada","market":"NV statewide power screen","type":"statewide-market","bbox":[35,-120.1,42.1,-114],"url":"/top-10/nevada","liveQuery":"Find 200 MW in Nevada in 12 months with grid plus onsite power","keywords":["top data center sites in Nevada","Nevada AI data center site selection","Nevada data center power availability","Nevada power-ready sites","Nevada substation capacity","NV statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:43:05.055Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwNjUyOTM0Ng","name":"Substation 106529346","lat":36.41188527777778,"lng":-114.9607711777778,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":14.83,"plantMw":null,"dcMi":13.74,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 106529346 ranks #1 in Nevada with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzU0Mjk5ODE4NQ","name":"Copper Mountain Substation","lat":35.88467028333333,"lng":-114.9581289833333,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":28.82,"plantMw":null,"dcMi":12.17,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Copper Mountain Substation ranks #2 in Nevada with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzYyMzE1MTM3","name":"Eldorado Substation","lat":35.79686508,"lng":-115.00940211,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":33.13,"plantMw":null,"dcMi":17.91,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Eldorado Substation ranks #3 in Nevada with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5Lzc5NjcxMDI2","name":"Marketplace Substation","lat":35.8192,"lng":-115.0113671833333,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":31.65,"plantMw":null,"dcMi":16.37,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Marketplace Substation ranks #4 in Nevada with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5Lzc5NjcxMDMy","name":"McCullough Substation","lat":35.80456162727273,"lng":-115.0124305181818,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":32.57,"plantMw":null,"dcMi":17.38,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"McCullough Substation ranks #5 in Nevada with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5Lzc5NzM0NzU1","name":"Mead Substation","lat":35.92825343999999,"lng":-114.832950035,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":29.85,"plantMw":null,"dcMi":13.2,"redundant":true,"needsFirmGen":true,"inCorridor":true,"summary":"Mead Substation ranks #6 in Nevada with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzM3NDI0NzExMg","name":"Robinson Summit Substation","lat":39.35754309189189,"lng":-115.1687256918919,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":213.04,"plantMw":null,"dcMi":214.86,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Robinson Summit Substation ranks #7 in Nevada with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzU5MzEyMTMzNQ","name":"Substation 593121335","lat":36.53418512,"lng":-114.77606486,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":28.12,"plantMw":null,"dcMi":26.78,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Substation 593121335 ranks #8 in Nevada with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzE2NjU1MTEyMw","name":"Northwest Substation","lat":36.33447492173913,"lng":-115.3297455173913,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":6.93,"plantMw":null,"dcMi":12.81,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Northwest Substation ranks #9 in Nevada with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzcxODM3ODc2","name":"Harry Allen Substation","lat":36.42767587777777,"lng":-114.9067934111111,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":17.85,"plantMw":null,"dcMi":16.45,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Harry Allen Substation ranks #10 in Nevada with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."}]}