{"title":"Top 10 power-ready AI data center sites in Nebraska","description":"Ranked list of the top power-ready AI data center sites in Nebraska, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"nebraska","label":"Nebraska","market":"NE statewide power screen","type":"statewide-market","bbox":[39.9,-104.1,43.1,-95.3],"url":"/top-10/nebraska","liveQuery":"Find 200 MW in Nebraska in 12 months with grid plus onsite power","keywords":["top data center sites in Nebraska","Nebraska AI data center site selection","Nebraska data center power availability","Nebraska power-ready sites","Nebraska substation capacity","NE statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:44:33.215Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwNDU2NzYxOA","name":"OPPD Blondo Street Substation","lat":41.27902189285714,"lng":-96.08030032857144,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":2.63,"plantMw":18,"dcMi":3.11,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"OPPD Blondo Street Substation ranks #1 in Nebraska with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwNDU3NDUxNQ","name":"Substation 104574515","lat":41.16827216363637,"lng":-96.19899850909091,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":5.23,"plantMw":264,"dcMi":3.23,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 104574515 ranks #2 in Nebraska with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEwNDU4MjgyNg","name":"Substation 104582826","lat":41.17027732857143,"lng":-96.1986301857143,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":5.35,"plantMw":264,"dcMi":3.31,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 104582826 ranks #3 in Nebraska with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEwNjAxNjgzMA","name":"Substation 106016830","lat":41.169573175,"lng":-95.97011026666665,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":6.47,"plantMw":null,"dcMi":5.62,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 106016830 ranks #4 in Nebraska with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzE2NjE0OTQ0OQ","name":"Substation 166149449","lat":41.16883106875,"lng":-96.08839470624999,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":6.54,"plantMw":264,"dcMi":0.35,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 166149449 ranks #5 in Nebraska with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEwMjU5MTk5OTI","name":"Plum Creek Substation","lat":42.16251574,"lng":-97.34188936000001,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":5.48,"plantMw":5,"dcMi":85.6,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Plum Creek Substation ranks #6 in Nebraska with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEwNDYzNDA2Nw","name":"Fort Calhoun Substation","lat":41.51903747999999,"lng":-96.0811948,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":14.04,"plantMw":18,"dcMi":12.02,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Fort Calhoun Substation ranks #7 in Nebraska with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzExMTU1NzUyNDM","name":"Haystack Substation","lat":42.2302089375,"lng":-97.21439456249998,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":0.28,"plantMw":5,"dcMi":84.09,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Haystack Substation ranks #8 in Nebraska with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzExMzI2MTI4MTU","name":"Substation 1132612815","lat":40.2711591,"lng":-98.6699425,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":0.26,"plantMw":3,"dcMi":36.93,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 1132612815 ranks #9 in Nebraska with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzEyOTM1MjMxNDg","name":"Canal Crossing Substation","lat":40.14301567777778,"lng":-103.7131875333333,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":5.32,"plantMw":150,"dcMi":74.2,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Canal Crossing Substation ranks #10 in Nebraska with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."}]}