{"title":"Top 10 power-ready AI data center sites in Michigan","description":"Ranked list of the top power-ready AI data center sites in Michigan, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"michigan","label":"Michigan","market":"MI statewide power screen","type":"statewide-market","bbox":[41.6,-90.5,48.4,-82.1],"url":"/top-10/michigan","liveQuery":"Find 200 MW in Michigan in 12 months with grid plus onsite power","keywords":["top data center sites in Michigan","Michigan AI data center site selection","Michigan data center power availability","Michigan power-ready sites","Michigan substation capacity","MI statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:45:03.709Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwMTQ5MDc0NDM","name":"Branch River Substation","lat":44.21571158,"lng":-87.88038533999999,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":9.13,"plantMw":3,"dcMi":23.02,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Branch River Substation ranks #1 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwMjU3NzE4Mg","name":"Wolfs Crossing Substation","lat":41.70746100344827,"lng":-88.23174207241378,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":7.79,"plantMw":3,"dcMi":4.54,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Wolfs Crossing Substation ranks #2 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEwMjU5Nzg1OQ","name":"Plano Substation","lat":41.683908,"lng":-88.47905057,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":765,"plantMi":20.62,"plantMw":3,"dcMi":14.23,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Plano Substation ranks #3 in Michigan with a 99/100 Livio Power Score, Tier A, 765 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEwMzUzMjI5Mg","name":"State Line Substation","lat":41.70428372222222,"lng":-87.51645518888888,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":4.99,"plantMw":null,"dcMi":0.29,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"State Line Substation ranks #4 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEwMzUzMjI5Ng","name":"ComEd Burnham 138kV-345kV Substation","lat":41.63345646363636,"lng":-87.54588005454544,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":9.22,"plantMw":null,"dcMi":5.29,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"ComEd Burnham 138kV-345kV Substation ranks #5 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEwNjYxNjg0MjU","name":"Substation 1066168425","lat":41.86831226,"lng":-88.22503653999999,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":9.16,"plantMw":135,"dcMi":2.57,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1066168425 ranks #6 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEwNzEwMjQyMTA","name":"Cypress Substation","lat":43.88745646363636,"lng":-88.27487344545456,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":0.16,"plantMw":2,"dcMi":22.19,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Cypress Substation ranks #7 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzExNjg1Njc5OA","name":"ComEd Wayne 138kV-345kV Substation","lat":41.98249168888889,"lng":-88.24033684444444,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":1.24,"plantMw":135,"dcMi":5.44,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"ComEd Wayne 138kV-345kV Substation ranks #8 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzExOTQxNTk0ODc","name":"Substation 1194159487","lat":41.86358282500001,"lng":-86.21962539999998,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":0.1,"plantMw":387,"dcMi":17.64,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1194159487 ranks #9 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzExOTQxNTk0OTM","name":"Substation 1194159493","lat":41.89235262,"lng":-86.2014121,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":2.29,"plantMw":401,"dcMi":19.69,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1194159493 ranks #10 in Michigan with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."}]}