{"title":"Top 10 power-ready AI data center sites in Maryland","description":"Ranked list of the top power-ready AI data center sites in Maryland, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"maryland","label":"Maryland","market":"MD statewide power screen","type":"statewide-market","bbox":[37.8,-79.5,39.8,-75],"url":"/top-10/maryland","liveQuery":"Find 200 MW in Maryland in 12 months with grid plus onsite power","keywords":["top data center sites in Maryland","Maryland AI data center site selection","Maryland data center power availability","Maryland power-ready sites","Maryland substation capacity","MD statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:47:08.562Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzExODQzNzI5NzQ","name":"Mars Substation","lat":38.95282093333334,"lng":-77.4921973,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":3.36,"plantMw":2,"dcMi":0.33,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Mars Substation ranks #1 in Maryland with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzgyNDU4MjQy","name":"Lexington 500kV Substation","lat":37.86805122499999,"lng":-79.42084170833333,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":35.58,"plantMw":null,"dcMi":51.27,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Lexington 500kV Substation ranks #2 in Maryland with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzgyNTExOTk1","name":"North Anna Substation","lat":38.06140374,"lng":-77.79758976000001,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":29.01,"plantMw":null,"dcMi":28.95,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"North Anna Substation ranks #3 in Maryland with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5Lzk2Mjc3MjY5","name":"Ladysmith Substation","lat":38.04648491666668,"lng":-77.55004358333333,"region":"Screened market","score":98,"tier":"A","months":9,"mwBand":">=500 MW","kv":500,"plantMi":27.55,"plantMw":null,"dcMi":36.59,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Ladysmith Substation ranks #4 in Maryland with a 98/100 Livio Power Score, Tier A, 500 kV, 9 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEwMzM1OTk1NzA","name":"Substation 1033599570","lat":38.24677572,"lng":-77.78736732,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":17.71,"plantMw":null,"dcMi":17.75,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1033599570 ranks #5 in Maryland with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzExMTU2MTM5MzE","name":"New Creek Wind Substation","lat":39.20020234,"lng":-79.14078574000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":3.46,"plantMw":2,"dcMi":47.29,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"New Creek Wind Substation ranks #6 in Maryland with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEyNjI0Mjc3OTk","name":"Cheltenham Substation","lat":38.70190845714286,"lng":-76.82741362857143,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":7.24,"plantMw":null,"dcMi":17.63,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Cheltenham Substation ranks #7 in Maryland with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzE0OTMxNDk0MQ","name":"Bristers Substation","lat":38.56297468181818,"lng":-77.59556072727274,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":12.79,"plantMw":null,"dcMi":11.81,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Bristers Substation ranks #8 in Maryland with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzE2ODkzNjM2Nw","name":"Delta Plant Substation","lat":39.73944644,"lng":-76.30494156,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":7.8,"plantMw":188,"dcMi":33.5,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Delta Plant Substation ranks #9 in Maryland with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzE4MDk5NDEwNw","name":"Substation 180994107","lat":39.20098950999999,"lng":-79.22188716999999,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.17,"plantMw":2,"dcMi":51.5,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 180994107 ranks #10 in Maryland with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."}]}