{"title":"Top 10 power-ready AI data center sites in Kansas","description":"Ranked list of the top power-ready AI data center sites in Kansas, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"kansas","label":"Kansas","market":"KS statewide power screen","type":"statewide-market","bbox":[36.9,-102.1,40.1,-94.6],"url":"/top-10/kansas","liveQuery":"Find 200 MW in Kansas in 12 months with grid plus onsite power","keywords":["top data center sites in Kansas","Kansas AI data center site selection","Kansas data center power availability","Kansas power-ready sites","Kansas substation capacity","KS statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:44:50.438Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzE0MTI4OTA3ODg","name":"Atlantic Substation","lat":38.91390826666667,"lng":-94.99331506666668,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":8.67,"plantMw":102,"dcMi":6.98,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Atlantic Substation ranks #1 in Kansas with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwNTg2MzEwODU","name":"Substation 1058631085","lat":37.36852347142857,"lng":-98.33069814285714,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":4.75,"plantMw":2,"dcMi":15.47,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1058631085 ranks #2 in Kansas with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzExMDIyNDA3OTk","name":"Substation 1102240799","lat":37.45583792857143,"lng":-98.37443044285715,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":0.51,"plantMw":2,"dcMi":16.98,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1102240799 ranks #3 in Kansas with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzE2NDY3MjEwMw","name":"West Gardner Substation","lat":38.788091025,"lng":-94.9889612625,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":0.18,"plantMw":102,"dcMi":12.21,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"West Gardner Substation ranks #4 in Kansas with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzQ2NDY4ODUwMw","name":"Thistle Substation","lat":37.29315845384615,"lng":-98.46486244615383,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":"200-500 MW","kv":345,"plantMi":4.49,"plantMw":3,"dcMi":6.87,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Thistle Substation ranks #5 in Kansas with a 99/100 Livio Power Score, Tier A, 345 kV, 8 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEwNjE3Mzc4MjU","name":"Reading Wind Substation","lat":38.48299853636364,"lng":-96.03676627272726,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":1.83,"plantMw":3,"dcMi":70.48,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Reading Wind Substation ranks #6 in Kansas with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEwODM2NjU4MDE","name":"Elm Creek 345kV Substation","lat":39.50471333333333,"lng":-97.5473329,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":5.45,"plantMw":3,"dcMi":103.55,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Elm Creek 345kV Substation ranks #7 in Kansas with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzExMDUyNzU4MTU","name":"Iron Star Substation","lat":37.64927549999999,"lng":-99.98006144285715,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":0.3,"plantMw":5,"dcMi":80.5,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Iron Star Substation ranks #8 in Kansas with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzExMDUzMTcyMTQ","name":"Neosho Ridge Substation","lat":37.39077373333333,"lng":-95.36398596666666,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":5.19,"plantMw":2,"dcMi":110.15,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Neosho Ridge Substation ranks #9 in Kansas with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzExMTUwODk1NDM","name":"Substation 1115089543","lat":37.85453167142857,"lng":-99.68123174285714,"region":"Screened market","score":96,"tier":"A","months":10,"mwBand":"200-500 MW","kv":345,"plantMi":1.17,"plantMw":2,"dcMi":71.88,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 1115089543 ranks #10 in Kansas with a 96/100 Livio Power Score, Tier A, 345 kV, 10 month estimated power path, and 200-500 MW MW capacity signal."}]}