{"title":"Top 10 power-ready AI data center sites in Georgia","description":"Ranked list of the top power-ready AI data center sites in Georgia, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"georgia","label":"Georgia","market":"GA statewide power screen","type":"statewide-market","bbox":[30.3,-85.7,35.1,-80.8],"url":"/top-10/georgia","liveQuery":"Find 200 MW in Georgia in 12 months with grid plus onsite power","keywords":["top data center sites in Georgia","Georgia AI data center site selection","Georgia data center power availability","Georgia power-ready sites","Georgia substation capacity","GA statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:44:23.204Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwMDU5NDA5MjI","name":"Wadley Substation","lat":32.88436696111111,"lng":-82.41571968888887,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":22.67,"plantMw":1,"dcMi":88.86,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Wadley Substation ranks #1 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwMjQzNDAzMTc","name":"Substation 1024340317","lat":33.41233574,"lng":-85.03155548000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.12,"plantMw":53,"dcMi":29.19,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 1024340317 ranks #2 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEwNTU3NTk4Nzk","name":"Substation 1055759879","lat":34.12412486666667,"lng":-84.92174108333332,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.05,"plantMw":724,"dcMi":14.54,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Substation 1055759879 ranks #3 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEwODc4NjYwOTI","name":"Bad Creek Hydro Substation","lat":35.00724728333334,"lng":-82.99714875000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.03,"plantMw":324,"dcMi":90.18,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Bad Creek Hydro Substation ranks #4 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEyMDg0Mzg1OTA","name":"Substation 1208438590","lat":31.92790492,"lng":-84.07755598000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":9.87,"plantMw":23,"dcMi":61.41,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 1208438590 ranks #5 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzEyMTYyNDM2OA","name":"Blandford Substation","lat":32.27459794,"lng":-81.28220981000001,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.2,"plantMw":182,"dcMi":136.12,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Blandford Substation ranks #6 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzEyMTgxMjEwMg","name":"Vogtle Substation (500KV/230KV)","lat":33.14561684375001,"lng":-81.76271131875002,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.25,"plantMw":1150,"dcMi":115.79,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Vogtle Substation (500KV/230KV) ranks #7 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzE1OTYwODE0NQ","name":"South Hall Substation","lat":34.21855934444445,"lng":-83.80228478333333,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":4.06,"plantMw":null,"dcMi":19.23,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"South Hall Substation ranks #8 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzE1OTc1ODMwNA","name":"Villa Rica Substation","lat":33.7414222117647,"lng":-84.85422302352941,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":19.84,"plantMw":807,"dcMi":13.69,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Villa Rica Substation ranks #9 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzE1OTc1ODMwOA","name":"Bradley Substation","lat":35.04252384705882,"lng":-84.95975051176471,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":20.59,"plantMw":3,"dcMi":19.11,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Bradley Substation ranks #10 in Georgia with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."}]}