{"title":"Top 10 power-ready AI data center sites in Florida","description":"Ranked list of the top power-ready AI data center sites in Florida, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"florida","label":"Florida","market":"FL statewide power screen","type":"statewide-market","bbox":[24.4,-87.7,31.1,-80],"url":"/top-10/florida","liveQuery":"Find 200 MW in Florida in 12 months with grid plus onsite power","keywords":["top data center sites in Florida","Florida AI data center site selection","Florida data center power availability","Florida power-ready sites","Florida substation capacity","FL statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-09-10T14:26:34.893Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwMjYxOTg0NQ","name":"Poinsett Substation FPL","lat":28.38425679090909,"lng":-80.91514940909093,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":6.41,"plantMw":null,"dcMi":33.21,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Poinsett Substation FPL ranks #1 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzEwMjY2MDcyNA","name":"Midway Substation","lat":27.37181534800001,"lng":-80.415527964,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":2.54,"plantMw":411,"dcMi":82.38,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Midway Substation ranks #2 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzEwMjY5ODI3NA","name":"Martin Plant Substation","lat":27.05738051666666,"lng":-80.56064205,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.23,"plantMw":533,"dcMi":62.6,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Martin Plant Substation ranks #3 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzEwMzA0NTAxMA","name":"FPL Andytown Substation","lat":26.03555748,"lng":-80.43957398,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":7.92,"plantMw":null,"dcMi":14.01,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"FPL Andytown Substation ranks #4 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzEwMzA2MTQwOA","name":"Levee Substation FPL","lat":25.81288231538461,"lng":-80.43551693846153,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":3.56,"plantMw":1,"dcMi":7.47,"redundant":true,"needsFirmGen":false,"inCorridor":true,"summary":"Levee Substation FPL ranks #5 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzE0NjA0MDk4NzI","name":"Clover Substation","lat":27.48087387142857,"lng":-80.54369967142858,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":4.65,"plantMw":75,"dcMi":90.92,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Clover Substation ranks #6 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzE0OTgxNzI1Mg","name":"Brookridge Substation","lat":28.57546851333333,"lng":-82.49797142000003,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":12.57,"plantMw":null,"dcMi":35.55,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Brookridge Substation ranks #7 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzE1MDM0OTAyMDM","name":"Substation 1503490203","lat":26.48283068,"lng":-81.46835094666666,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":2.45,"plantMw":75,"dcMi":76,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 1503490203 ranks #8 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzE2MDE3MDc2MA","name":"Orange River Substation FPL","lat":26.67299833076923,"lng":-81.76887953076924,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":1.77,"plantMw":62,"dcMi":94.91,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Orange River Substation FPL ranks #9 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzE2NjY3MjMyNw","name":"Crystal River Plant Substation","lat":28.960223604,"lng":-82.699565384,"region":"Screened market","score":99,"tier":"A","months":8,"mwBand":">=500 MW","kv":500,"plantMi":0.46,"plantMw":721,"dcMi":54.79,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Crystal River Plant Substation ranks #10 in Florida with a 99/100 Livio Power Score, Tier A, 500 kV, 8 month estimated power path, and >=500 MW MW capacity signal."}]}