{"title":"Top 10 power-ready AI data center sites in Alaska","description":"Ranked list of the top power-ready AI data center sites in Alaska, with Livio Power scores, substation voltage, estimated months to power, MW capacity signal, and diligence keywords for site selection teams.","market":{"slug":"alaska","label":"Alaska","market":"AK statewide power screen","type":"statewide-market","bbox":[51,-179.9,72,-129.8],"url":"/top-10/alaska","liveQuery":"Find 200 MW in Alaska in 12 months with grid plus onsite power","keywords":["top data center sites in Alaska","Alaska AI data center site selection","Alaska data center power availability","Alaska power-ready sites","Alaska substation capacity","AK statewide power screen","AI data center sites","power-ready data center sites","data center power availability","data center site selection","speed to power","utility interconnection","substation proximity","MW capacity signal","RFS date","grid plus onsite power","behind the meter generation","Livio Power"]},"source":"search_index","generatedAt":"2026-06-11T07:43:06.260Z","caveat":"Screening estimate only; not a utility interconnection guarantee, engineering certification, legal opinion, environmental report, water-rights opinion, permit approval, title report, or survey.","sites":[{"rank":1,"siteId":"LP-d2F5LzEwODQ0NzU5NA","name":"Point MacKenzie Substation","lat":61.24826615000001,"lng":-150.0315187071429,"region":"Screened market","score":82,"tier":"A","months":16,"mwBand":"100-200 MW","kv":230,"plantMi":5.77,"plantMw":78,"dcMi":null,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Point MacKenzie Substation ranks #1 in Alaska with a 82/100 Livio Power Score, Tier A, 230 kV, 16 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":2,"siteId":"LP-d2F5LzExMzQzODUzMzE","name":"Substation 1134385331","lat":64.05992268333334,"lng":-148.8970034166666,"region":"Screened market","score":82,"tier":"A","months":16,"mwBand":"100-200 MW","kv":230,"plantMi":0.15,"plantMw":2,"dcMi":null,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 1134385331 ranks #2 in Alaska with a 82/100 Livio Power Score, Tier A, 230 kV, 16 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":3,"siteId":"LP-d2F5LzExMzU2NjYxOQ","name":"Substation 113566619","lat":61.23033968000001,"lng":-149.71229894,"region":"Screened market","score":82,"tier":"A","months":16,"mwBand":"100-200 MW","kv":230,"plantMi":0.12,"plantMw":347,"dcMi":null,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 113566619 ranks #3 in Alaska with a 82/100 Livio Power Score, Tier A, 230 kV, 16 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":4,"siteId":"LP-d2F5LzE5MzEyMjI2Ng","name":"Substation 193122266","lat":61.52384754444444,"lng":-149.6128155111111,"region":"Screened market","score":82,"tier":"A","months":16,"mwBand":"100-200 MW","kv":230,"plantMi":7.26,"plantMw":6,"dcMi":null,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 193122266 ranks #4 in Alaska with a 82/100 Livio Power Score, Tier A, 230 kV, 16 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":5,"siteId":"LP-d2F5LzI5MzgyMjk4","name":"University Substation","lat":61.17973486666667,"lng":-149.7947347833333,"region":"Screened market","score":82,"tier":"A","months":16,"mwBand":"100-200 MW","kv":230,"plantMi":3.09,"plantMw":null,"dcMi":null,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"University Substation ranks #5 in Alaska with a 82/100 Livio Power Score, Tier A, 230 kV, 16 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":6,"siteId":"LP-d2F5LzMyNjQ3NzE4OQ","name":"Substation 326477189","lat":64.81597416000001,"lng":-147.72486092,"region":"Screened market","score":82,"tier":"A","months":16,"mwBand":"100-200 MW","kv":230,"plantMi":0.05,"plantMw":40,"dcMi":null,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 326477189 ranks #6 in Alaska with a 82/100 Livio Power Score, Tier A, 230 kV, 16 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":7,"siteId":"LP-d2F5LzkxMTYxMzAyMg","name":"Substation 911613022","lat":56.72932493999999,"lng":-130.59777786,"region":"Screened market","score":82,"tier":"A","months":16,"mwBand":"100-200 MW","kv":287,"plantMi":0.03,"plantMw":null,"dcMi":null,"redundant":true,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 911613022 ranks #7 in Alaska with a 82/100 Livio Power Score, Tier A, 287 kV, 16 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":8,"siteId":"LP-d2F5LzE3MjY1MTY2OQ","name":"Prince Rupert Substation","lat":54.2566453,"lng":-130.23161745,"region":"Screened market","score":74,"tier":"B","months":20,"mwBand":"100-200 MW","kv":287,"plantMi":28.83,"plantMw":null,"dcMi":null,"redundant":true,"needsFirmGen":true,"inCorridor":false,"summary":"Prince Rupert Substation ranks #8 in Alaska with a 74/100 Livio Power Score, Tier B, 287 kV, 20 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":9,"siteId":"LP-d2F5LzYxMDE5OTg4MA","name":"Substation 610199880","lat":56.94046933333333,"lng":-130.26640215,"region":"Screened market","score":72,"tier":"B","months":21,"mwBand":"100-200 MW","kv":287,"plantMi":19.25,"plantMw":null,"dcMi":null,"redundant":false,"needsFirmGen":false,"inCorridor":false,"summary":"Substation 610199880 ranks #9 in Alaska with a 72/100 Livio Power Score, Tier B, 287 kV, 21 month estimated power path, and 100-200 MW MW capacity signal."},{"rank":10,"siteId":"LP-d2F5LzkxMTYwNDQ5Nw","name":"Tatogga Substation","lat":57.71319486666667,"lng":-129.98726395,"region":"Screened market","score":68,"tier":"B","months":23,"mwBand":"100-200 MW","kv":287,"plantMi":45.41,"plantMw":3,"dcMi":null,"redundant":false,"needsFirmGen":true,"inCorridor":false,"summary":"Tatogga Substation ranks #10 in Alaska with a 68/100 Livio Power Score, Tier B, 287 kV, 23 month estimated power path, and 100-200 MW MW capacity signal."}]}